Case Study Preview: Interim VP of Operations
A Beckway operator recently acted as the interim VP of operations at a $125M textile distributor. During this time, he conducted a physical inventory, installed a 5S program, and realized an 85% reduction of backlog that resulted in a cash flow improvement of $1.6M. To learn more, contact Chris Nichols at cnichols@beckway.com.