Beckway team members optimized the throughput of a $40M extruded plastic manufacturer in the outdoor furniture sector. By reviewing current operations and performing a root cause analysis, the team was able to build and deploy an hour-by-hour production system that yielded a net increase in throughput by 12% and reduced variation in production by 32%. To learn more, contact Jon Bloomfield at jbloomfield@beckway.com.